The latest news from the Unipart Rail Group of Companies



Park Signalling Solutions in the Spotlight

Park Signalling Solutions in the Spotlight



The Park Signalling team recently assisted the Network Rail signalling technical support team with the installation and commissioning of the MT04 replacement Solid State Interlocking (SSI) Technician’s Terminal product at Lincoln Signalling Control Centre, in the early hours of Sunday 12th May. This...



Targeting the reduction of £300m of cost

Targeting the reduction of £300m of cost

Using SmartSander to reduce costs and improve wheel adhesion


Tags: Better Reliability Condition Based Monitoring Engineering Technology Improved Performance Value - Innovation Park Signalling Reduced Cost Traction and Rolling Stock Unipart Dorman


Low adhesion is reported to cost over £300m per year in the UK and recent industry (RSSB) trials have demonstrated that in low adhesion conditions variable rate sanders can provide dramatic reductions in stopping distance over single rate systems. SmartSander from Unipart Rail contributes to reducin...





Search Our Blogs

Recent Tweets


Commenting Guidelines
By commenting on this blog you agree to abide by our Terms and Conditions. Although we will do our utmost to avoid it, we reserve the right to edit, move or delete any comments which do not follow the guidelines provided